History | |
Start of Investigation | January 1948 |
Start of Construction | August 1956 |
Date of Operation | May 1960 |
Installed Capacity | 100,000 KW ( 4 x 25,000 KW) |
Energy Capability | 516,000,000 KWH |
General | |
Drainage area at dam site | 936 KM2 |
Gross head | 155 m |
Maximum Discharge | 838 cms |
Minimum Discharge | 9.8 cms |
Maximum Reservoir Level | Elev. 579.50 m.a.s.l. |
Minimum Reservoir Level | Elev. 555.00 m.a.s.l. |
Usable Storage | 48.2 MCM |
Total at FSL | 22.83 MCM |
Present MSL @ 563 m.a.s.l. | 5.27 MCM |
Live Storage (MSL to FSL) | 17.56 MCM |