MENU

 

Statistical Data
River Basin Barit
Start of Construction March 1955
Date of Operation September 1, 1957
Number One (1) unit
Installed Capacity 1.8 MW
Usable Storage Run-of-river
Effective Head 19.2 m
Discharge 11.5 cms
Energy Capability 12,000,000 kwh at 76% p.f.