MENU

General
River Basin Loboc
Start of Construction 1955
Date of Commissioning
    Initial
    Ultimate

April 06, 1957
January 20, 1968
No. of Units 3
Installed Capacity 1.2 MW
Usable Storage Run-of-river
Effective Head 11.1 m
Discharge 14.3 cms
Energy Capability 9,450,000 KWH
Dam
Type Overflow (Concrete)
Initial Dam Crest Elevation 19.00 m.a.s.l.
Ultimate Dam Crest Elevation 20.70 m.a.s.l.
Foot of Dam Elevation 15.50 m.a.s.l.