MENU

History
Start of Construction May 1956
Date of Commissioning December 29, 1957
No. of Units Two (2)
Installed Capacity 1.6 MW
Usable Storage Run-of-River
Energy Capability 10,500,000 KWH
Common Facilities
Diversion Dam
    Type
    Ave. Ht. Above Riverbed
    Length
    Top Elevation

Concrete Flow
1.00 m
22.00 m
469.50 m.a.s.l.