MENU

History
Start of Construction
          Unit No. 1
          Unit No. 2

January 16, 1979
January 16, 1979
Date of Commercial Operation
          Unit No. 1
          Unit No. 2

March 05, 1983
December 17, 1983
Common Facilities
Basic Data
       Drainage Area
       Type

1,883 km²
Run-of-River
Dam
       Type
       Length


       Crest Elevation

Concrete Gravity
173.6 m divided into 14 blocks with spillway gates centrally located at block no.7 and 10, two power intake gates at block no.5
37.5 m a.s.l.