MENU

 

History
Start of Investigation January 1948
Start of Construction August 1956
Date of Operation May 1960
Installed Capacity 100,000 KW ( 4 x 25,000 KW)
Energy Capability 516,000,000 KWH
General
Drainage area at dam site 936 KM2
Gross head 155 m
Maximum Discharge 838 cms
Minimum Discharge 9.8 cms
Maximum Reservoir Level Elev. 579.50 m.a.s.l.
Minimum Reservoir Level Elev. 555.00 m.a.s.l.
Usable Storage 48.2 MCM
Total at FSL 22.83 MCM
Present MSL @ 563 m.a.s.l. 5.27 MCM
Live Storage (MSL to FSL) 17.56 MCM