PHILGEPS Reference No. | 9794577 |
---|---|
PR Number | MA-A2M23-082 |
Notice ID | 9794577 |
Mode of Procurement | Public Bidding - Infra/Civil Works |
Approved Budget for the Contract | ₱8,985,360.79 |
Bid Description | Rehabilitation of Housing Quarters (Twelve (12) units at Agus 1 & 2 HPPC, PawakSaguiaran, Lanao del Sur and Two (2) units at MRSQ and NPC Housing Ditucalan, Iligan City (100 calendar days) The works and services to be performed by the Contractor for this undertaking shall essentially consist of, but not limited to the following Repair of housing quarters (twelve (12) units at Agus 2 HEP, Pawak, Saguiaran, Lanao del Sur and two (2) units at MRSQ, Ma. Cristina and NPC housing, Ditucalan, Iligan City, respectively). A. MOBILIZATION B. CONSTRUCTION SAFETY AND HEALTH PROGRAM C. MATERIAL and STRENGTH TESTING (if applicable) D. REPAIR OF EMPLOYEES HOUSING QUARTER no. 10-DUPLEX-A, S. R. SUMA at Pawak, Saguiaran, Lanao del Sur 1. DEMOLITION/REPLACEMENT OF DILAPIDATED WOOD FLOORING, CABINET, CEILING, OLD FLOOR TILES, DOORS, STAINLESS SINK, CORR. G.I. SHTS., DOWNSPOUTS, GUTTER, FASCIA BOARD AND WORN-OUT PIPE EMBEDDED IN EXISTING CONCRETE FLOORING AND WALL. 2. EXCAVATION/BACKFILLING WORKS 3. CONCRETE WORKS 4. REINFORCEMENT BAR DSB 5. MASONRY AND PLASTERING 6. CEILING WORKS 7. TILE WORKS 8. INSTALLATION OF DOORS, WINDOWS AND RAILINGS 9. REPAIR & REPLACEMENT OF COMFORT ROOM FIXTURES 10. REPLACEMENT OF DILAPIDATED CABINET AND STAINLESS SINK 11. ROOF SHEATHING 12. REPLACEMENT OF LIGHTING FIXTURES 13. PAINTING WORKS, OUTSIDE AND INSIDE INCLUDING CEILING BOARDS E. REPAIR OF EMPLOYEES HOUSING QUARTER no. 2-DUPLEX-B, J. M. GAMOR at Pawak, Saguiaran, Lanao del Sur 1. DEMOLITION/REPLACEMENT OF DILAPIDATED WOOD FLOORING, CABINET, CEILING, OLD FLOOR TILES, DOORS, STAINLESS SINK, CORR. G.I. SHTS., DOWNSPOUTS, GUTTER, FASCIA BOARD AND WORN-OUT PIPE EMBEDDED IN EXISTING CONCRETE FLOORING AND WALL. 2. EXCAVATION/BACKFILLING WORKS 3. CONCRETE WORKS 4. REINFORCEMENT BAR DSB 5. MASONRY AND PLASTERING 6. CEILING WORKS 7. TILE WORKS 8. INSTALLATION OF DOORS, WINDOWS AND RAILINGS 9. REPAIR & REPLACEMENT OF COMFORT ROOM FIXTURES 10. REPLACEMENT OF DILAPIDATED CABINET AND STAINLESS SINK 11. ROOF SHEATHING 12. REPLACEMENT OF LIGHTING FIXTURES 13. PAINTING WORKS, OUTSIDE AND INSIDE INCLUDING CEILING BOARDS F. REPAIR OF EMPLOYEES HOUSING QUARTER no. 5-DUPLEX-B, A. P. BANISIL at Pawak, Saguiaran, Lanao del Sur 1. DEMOLITION/REPLACEMENT OF DILAPIDATED WOOD FLOORING, CABINET, CEILING, OLD FLOOR TILES, DOORS, STAINLESS SINK, CORR. G.I. SHTS., DOWNSPOUTS, GUTTER, FASCIA BOARD AND WORN-OUT PIPE EMBEDDED IN EXISTING CONCRETE FLOORING AND WALL. 2. EXCAVATION/BACKFILLING WORKS 3. CONCRETE WORKS 4. REINFORCEMENT BAR DSB 5. MASONRY AND PLASTERING 6. CEILING WORKS 7. TILE WORKS 8. INSTALLATION OF DOORS, WINDOWS AND RAILINGS 9. REPAIR & REPLACEMENT OF COMFORT ROOM FIXTURES 10. REPLACEMENT OF DILAPIDATED CABINET AND STAINLESS SINK 11. ROOF SHEATHING 12. REPLACEMENT OF LIGHTING FIXTURES 13. PAINTING WORKS, OUTSIDE AND INSIDE INCLUDING CEILING BOARDS G. REPAIR OF EMPLOYEES HOUSING QUARTER no. 5-DUPLEX-A, J. C. IBRAHIM at Pawak, Saguiaran, lanao del sur 1. DEMOLITION/REPLACEMENT OF DILAPIDATED WOOD FLOORING, CABINET, CEILING, OLD FLOOR TILES, DOORS, STAINLESS SINK, CORR. G.I. SHTS., DOWNSPOUTS, GUTTER, FASCIA BOARD AND WORN-OUT PIPE EMBEDDED IN EXISTING CONCRETE FLOORING AND WALL. 2. EXCAVATION/BACKFILLING WORKS 3. CONCRETE WORKS 4. REINFORCEMENT BAR DSB 5. MASONRY AND PLASTERING 6. CEILING WORKS 7. TILE WORKS 8. INSTALLATION OF DOORS, WINDOWS AND RAILINGS 9. REPAIR & REPLACEMENT OF COMFORT ROOM FIXTURES 10. REPLACEMENT OF DILAPIDATED CABINET AND STAINLESS SINK 11. ROOF SHEATHING 12. REPLACEMENT OF LIGHTING FIXTURES 13. PAINTING WORKS, OUTSIDE AND INSIDE INCLUDING CEILING BOARDS H. REPAIR OF EMPLOYEES HOUSING QUARTER no. 14-2BRS-L, S. P. MAMAINTE at Pawak, Saguiaran, Lanao del Sur 1. DEMOLITION/REPLACEMENT OF DILAPIDATED CABINET, CEILING BOARDS, OLD FLOOR TILES, DOORS, STAINLESS SINK, FASCIA BOARD 2. PLUMBING AND SANITARY WORKS 3. CEILING WORKS 4. TILE WORKS 5. SCHEDULE OF DOORS AND WINDOWS 6. REPLACEMENT/INSTALLAMENT OF WOODEN CABINET AND KITCHEN SINK 7. REPLACEMENT OF LIGHTING FIXTURES 8. PAINTING WORKS, OUTSIDE AND INSIDE INCLUDING CEILING BOARDS I. REPAIR OF EMPLOYEES HOUSING QUARTER no. 10-DUPLEX-B, D.D. DAYAAN at Pawak, Saguiaran, Lanao del Sur 1. DEMOLITION/REPLACEMENT OF DILAPIDATED WOOD FLOORING, CABINET, CEILING, OLD FLOOR TILES, DOORS, STAINLESS SINK, CORR. G.I. SHTS., DOWNSPOUTS, GUTTER, FASCIA BOARD AND WORN-OUT PIPE EMBEDDED IN EXISTING CONCRETE FLOORING AND WALL. 2. EXCAVATION/BACKFILLING WORKS 3. CONCRETE WORKS 4. REINFORCEMENT BAR DSB 5. MASONRY AND PLASTERING 6. CEILING WORKS 7. TILE WORKS 8. INSTALLATION OF DOORS, WINDOWS AND RAILINGS 9. REPAIR & REPLACEMENT OF COMFORT ROOM FIXTURES 10. REPLACEMENT OF DILAPIDATED CABINET AND STAINLESS SINK 11. ROOF SHEATHING 12. REPLACEMENT OF LIGHTING FIXTURES 13. PAINTING WORKS J. REPAIR OF EMPLOYEES HOUSING QUARTER no. 8-2BRS-L, C. M. MOCTAR at Pawak, Saguiaran, Lanao del Sur 1. DEMOLITION/REPLACEMENT OF DILAPIDATED CABINET, CEILING, OLD FLOOR TILES, DOORS, STAINLESS SINK, CORR. G.I. SHTS., DOWNSPOUTS, GUTTER, FASCIA BOARD AND WORN-OUT PIPE EMBEDDED IN EXISTING CONCRETE FLOORING AND WALL. 2. EXCAVATION/BACKFILLING WORKS 3. CONCRETE WORKS 4. REINFORCEMENT BAR DSB 5. MASONRY AND PLASTERING 6. PLUMBING AND SANITARY WORKS 7. CEILING WORKS 8. TILE WORKS 9. INSTALLATION OF DOORS, WINDOWS AND RAILINGS 10. REPLACEMENT/INSTALLAMENT OF WOODEN CABINET AND KITCHEN SINK 11. ROOF SHEATHING 12. REPLACEMENT OF LIGHTING FIXTURES 13. PAINTING WORKS, OUTSIDE AND INSIDE INCLUDING CEILING BOARDS K. REPAIR OF EMPLOYEES HOUSING QUARTER no. 1-DUPLEX-A, C. P. SULTAN at Pawak, Saguiaran, Lanao del Sur 1. DEMOLITION/REPLACEMENT OF DILAPIDATED WOOD FLOORING, CABINET, CEILING, OLD FLOOR TILES, DOORS, STAINLESS SINK, CORR. G.I. SHTS., DOWNSPOUTS, GUTTER, FASCIA BOARD AND WORN-OUT PIPE EMBEDDED IN EXISTING CONCRETE FLOORING AND WALL. 2. EXCAVATION/BACKFILLING WORKS 3. CONCRETE WORKS 4. REINFORCEMENT BAR DSB 5. MASONRY AND PLASTERING 6. CEILING WORKS 7. TILE WORKS 8. INSTALLATION OF DOORS, WINDOWS AND RAILINGS 9. REPAIR & REPLACEMENT OF COMFORT ROOM FIXTURES 10. REPLACEMENT OF DILAPIDATED CABINET AND STAINLESS SINK 11. ROOF SHEATHING 12. REPLACEMENT OF LIGHTING FIXTURES 13. PAINTING WORKS L. REPAIR OF EMPLOYEES HOUSING QUARTER no. 9-2BRS-L, C. L. MARIANO at Pawak, Saguiaran, Lanao del Sur 1. DEMOLITION/REPLACEMENT OF DILAPIDATED CABINET, CEILING, OLD FLOOR TILES, DOORS, STAINLESS SINK, CORR. G.I. SHTS., DOWNSPOUTS, GUTTER, FASCIA BOARD AND WORN-OUT PIPE EMBEDDED IN EXISTING CONCRETE FLOORING AND WALL. 2. EXCAVATION/BACKFILLING WORKS 3. CONCRETE WORKS 4. REINFORCEMENT BAR DSB 5. MASONRY AND PLASTERING 6. PLUMBING AND SANITARY WORKS 7. CEILING WORKS 8. TILE WORKS 9. INSTALLATION OF DOORS, WINDOWS AND RAILINGS 10. REPLACEMENT/INSTALLAMENT OF WOODEN CABINET AND KITCHEN SINK 11. ROOF SHEATHING 12. REPLACEMENT OF LIGHTING FIXTURES 13. PAINTING WORKS, OUTSIDE AND INSIDE INCLUDING CEILING BOARDS M. REPAIR OF EMPLOYEES HOUSING QUARTER no. 6-2BRS-L, A. M. DILABACUN at Pawak, Saguiaran, Lanao del Sur 1. DEMOLITION/REPLACEMENT OF DILAPIDATED CABINET, CEILING, OLD FLOOR TILES, DOORS, STAINLESS SINK, CORR. G.I. SHTS., DOWNSPOUTS, GUTTER, FASCIA BOARD AND WORN-OUT PIPE EMBEDDED IN EXISTING CONCRETE FLOORING AND WALL. 2. EXCAVATION/BACKFILLING WORKS 3. CONCRETE WORKS 4. REINFORCEMENT BAR DSB 5. MASONRY AND PLASTERING 6. PLUMBING AND SANITARY WORKS 7. CEILING WORKS 8. TILE WORKS 9. INSTALLATION OF DOORS, WINDOWS AND RAILINGS 10. REPLACEMENT/INSTALLAMENT OF WOODEN CABINET AND KITCHEN SINK 11. ROOF SHEATHING 12. REPLACEMENT OF LIGHTING FIXTURES 13. PAINTING WORKS, OUTSIDE AND INSIDE INCLUDING CEILING BOARDS N. REPAIR OF EMPLOYEES HOUSING QUARTER no. 7-DUPLEX-A, D. N. MALOGAO at Pawak, Saguiaran, Lanao del Sur 1. DEMOLITION/REPLACEMENT OF DILAPIDATED CEILING BOARDS, DOORS, WINDOWS 2. CEILING WORKS 3. INSTALLATION OF DOORS, WINDOWS AND RAILINGS 4. PAINTING WORKS O. REPAIR OF EMPLOYEES HOUSING QUARTER no. 7-DUPLEX-B, N. A. P. MAMAROBA at Pawak, Saguiaran, Lanao del Sur 1. DEMOLITION/REPLACEMENT OF DILAPIDATED WOOD FLOORING, CABINET, CEILING, OLD FLOOR TILES, DOORS, STAINLESS SINK, CORR. G.I. SHTS., DOWNSPOUTS, GUTTER, FASCIA BOARD AND WORN-OUT PIPE EMBEDDED IN EXISTING CONCRETE FLOORING AND WALL. 2. EXCAVATION/BACKFILLING WORKS 3. CONCRETE WORKS 4. REINFORCEMENT BAR DSB 5. MASONRY AND PLASTERING 6. CEILING WORKS 7. TILE WORKS 8. INSTALLATION OF DOORS, WINDOWS AND RAILINGS 9. REPAIR & REPLACEMENT OF COMFORT ROOM FIXTURES 10. REPLACEMENT OF DILAPIDATED CABINET AND STAINLESS SINK 11. ROOF SHEATHING 12. REPLACEMENT OF LIGHTING FIXTURES 13. PAINTING WORKS P. REPAIR OF EMPLOYEES HOUSING QUARTER no. 32-B, S.C. MACAGAAN at Housing Compound, Ditucalan, Iligan City 1. DEMOLITION/REPLACEMENT OF DILAPIDATED WOOD FLOORING AND JOIST 2. TILE WORKS Q. REPAIR OF EMPLOYEES HOUSING QUARTER (MRSQ NO. 5), M.T. BAUTIL at MRSQ Housing, Ditucalan, Iligan City 1. DEMOLITION OF EXISTING DOORS, WATER CLOSETS, SHOWER HEADS, LAVATORIES, WOODEN CABINETS, FLOOR AND WALL TILES 2. TILE WORKS 3. REPLACEMENT OF DOORS, WATER CLOSETS, HEAD SHOWERS, LAVATORY AND KITCHEN SINK 4. REPLACEMENT/INSTALLMENT OF WOODEN CABINET PCAB License & Registration Category: General Building– Category C or D; Building or Industrial Plant- “Small B” |
Pre Bid Conference | BAC BIDDING ROOM
MINDANAO GENERATION HEADQUARTERS
NATIONAL POWER CORPORATION
MARIA CRISTINA ILIGAN CITY June 5, 2023 9:00pm |
Bid Opening | BAC BIDDING ROOM
MINDANAO GENERATION HEADQUARTERS
NATIONAL POWER CORPORATION
MARIA CRISTINA ILIGAN CITY June 19, 2023 9:30am |
File Attachment/s | No File Attachment |
Notice of Award | View Attachment |
Notice of Proceed | View Attachment |
Purchase Order or Contract | View Attachment |
Remarks | AWARDED |